There’s a lot going on in the rural areas of Boulder County! Here’s the bird’s-eye view of the projects we think are of broadest interest. The map is interactive:
-
Click on one of our icons to identify the issue, and then find it in the lists below to get more information about it.
-
Zoom in on your neighborhood or any area you’re particularly interested in to see what’s brewing.
Check Out the Issues
Find these rural issues below:
-
Top 3 Issues on our rural radar
-
Boulder County development applications (dockets)
-
Other applications, policies, and projects
THREE (!) Annexation and Development Applications in Lafayette (Arapahoe Rd and Hwy 287; Baseline Road and N. 119th St.; 9776/9850 Arapahoe Road)
#1 At the western gateway to Lafayette, 287/Arapahoe:
-
Lafayette is considering a proposal to annex 36 acres of privately owned County land at the southwest corner of Arapahoe Road and Highway 287.
-
The associated “The Range at Lafayette” development would bring 343 apartments, 110 townhomes, and a mixture of retail including a big-box store to the land, which is currently designated as “Agricultural Land of National Importance.”
-
A first technical hurdle was cleared on January 7, when the Council determined that the proposal submitted by the owner (Tebo Partnership) and developer (Kensington Development Group) was "in substantial compliance" with Colorado’s Municipal Annexation Act of 1965.
-
It cleared a second technical hurdle when the Lafayette City Council voted unanimously on February 18 that it meets "elibibility" requirements
-
As we learned in Longmont’s Quail road annexation issue: Annexations are “discretionary legislative actions” and Council can decide not to annex.
-
A citizen petition against the annexation has gathered over 2,000 signatures.
-
Concerns include that the 4-story apartment buildings are not in harmony with Lafayette’s comprehensive plan and the “Adaptable Commercial” zoning designation; that the visual and traffic impacts of the proposed development would overburden the community; and that resources such as water and schools would not be sufficient for such a large development.
-
Action: Comments to the City regarding this proposed annexation can be submitted through the City's website for comments linked here. Reference the "The Range at Lafayette Annexation" and direct the comments to the City Council.
#2 At the eastern gateway to Lafayette, Baseline and N. 119th St.:
-
The owner of 78 acres that straddle Baseline Road west of the N. 119th Street intersection has recently petitioned the City for annexation of the property. It contains portions of a farm that was operated by the Waneka family, one of Lafayette's pioneering families.
-
The parcel is currently in the County and has zoning designations of Agricultural and Rural Residential. There is one unoccupied residence north of Baseline Road and vacant farmland in the other areas.
-
The owner is working with a developer (Kairoi Residential) on a plan for the property, if annexed.
-
On February 27, the developer held a required first "neighborhood meeting." The meeting was standing-room-only, packed with over 100 residents who voiced their vigorous opposition to the development of this land. No one spoke in favor.
-
Commenters noted that the land has long been a top priority on the City's wish-list for parks and open space. Its location makes it the "eastern gateway" into the City of Lafayette.
-
When asked for a possible number of housing units to be built, the developer would not give an estimate.
-
Citizens have organized a website (Preserve Lafayette) to oppose the development and advocate for incorporating the parcel into the City's open space holdings.
-
The website gives the following summary: "For more than a century, Lafayette’s eastern gateway has been rural land, reflecting our agricultural roots. In 2019, Lafayette took the first step to preserve that gateway by buying the Old Town Pond, the Waneka Centennial Farm homestead, and the land on the southeast corner of 119th and Baseline as open space. Lafayette and Boulder County then partnered to purchase the remaining farmland east of 120th. The parcels on the southwest and northwest corners of 119th and Baseline are the missing pieces in this open space puzzle. They would join our existing open space parcels together, creating a nature and wildlife ecosystem that stretches from Lafayette’s Old Town Pond on the west to Powers Marsh on the east. That's why this land is a top priority in the city’s parks and open space acquisition plan."
-
Action: Comments to the City regarding this proposed annexation can be submitted through the City's website for comments linked here. Reference the "Gateway Lafayette Annexation" and direct the comments to the City Council, Parks, and Open Space choices in the listed departments.
-
The City's website for this proposed annexation and development is here: Gateway Lafayette (Note, the parcel's address is incorrectly stated on this website.) No firm dates are available yet for the next public hearing on this issue. Check the City website for updates.
#3 New one! On Arapahoe Road, just announced on March 10.
-
19.5 acres at 9776 and 9850 Arapahoe Road, west of the City boundaries
-
Developer-led neighborhood meeting, March 20 at 6 pm, 2800 Dagny Way in Lafayette.
-
City website announcement of the meeting is linked here
Broader issue: Lafayette and other cities on the Front Range are facing pressure from the Governor and State Legislature to “densify” housing in “transit-oriented communities.” This was codified in House Bill 24-1313, passed in May of 2024 as a means to increase housing in transit areas and thereby increase ridership on public transit. Densities of 40 dwelling units per acre are mandated in the legislation, where typically the higher densities in Lafayette are in the range of ~16 units per acre. This is a hot-potato issue that is sparking debate and pushback as municipalities grapple with how to preserve the character and quality of life of their communities.
Information Links:
City website on The Range at Lafayette concept plan
Press coverage of upcoming hearing
More press coverage of plans online
Preserve Lafayette - Opposition website related to the Eastern Gateway annexation
Link to Write to the Lafayette City Council
Top 3 Issues on Our Rural Radar (from our Home page)

Longmont: Kanemoto Conservation Easement Conditional Termination/Possible 426-unit Subdivision Development (Airport Road/Diagonal Hwy): MARCH UPDATE: No change from December. DECEMBER UPDATE: The opposition group will appeal the District Court Decision. The case now moves to the Colorado Court of Appeals. Fundraising for the legal fees is in progress and the group is within a few thousand dollars of having the needed funds. Please see the Go Fund Me site to donate. NOVEMBER UPDATE: The Boulder County District Court judge ruled against the neighbors' complaint. The opposition group is considering next steps. Development could only occur if the Longmont City Council votes to annex the parcel into the City.
OCTOBER/SEPTEMBER UPDATE: No change from August. AUGUST UPDATE: All documents and responses have been filed with the Boulder County District Court. The decision by the Judge is the next step. The timing will depend on Judge Gunning's caseload. JULY UPDATE: The month of August will be important for the opposition group, Keep Airport Road Environmental and Safe (KARES). KARES filed its Opening Brief on July 8 with the Boulder County District Court. Barring an extension, the County has until August 12 to respond. KARES will then file its Reply by 14 days thereafter. The Court will then review the KARES case for merit and decide if the Boulder County decision to terminate the Conservation Easement should be vacated. Donations to the legal fund are particularly critical now for the group. KARES has received a $1,000 matching grant to assist with legal expenses. Every dollar you contribute will be matched up to the $1,000. Visit the KARES website to donate (tax-exempt). Also, just set up by the group: please link your King Soopers card to the cause-- it's a way to donate without spending an extra penny, every time you shop. Watch the one-minute video on how to link your card. JUNE UPDATE: The opposition group KARES (Keep Airport Road Environmental and Safe) is now fiscally sponsored by the tax-exempt non-profit, the Conservation Easement Preservation Society (CEPS). This new 501(c)(3) non-profit just formed in late March, motivated by the Kanemoto issue and the more general issues raised by the County's actions regarding Conservation Easements. The expressed mission of CEPS is to preserve and protect conservation easements in Boulder County from residential and commercial development. The mission is to also educate the public regarding the environmental, ecological, and communal benefits of conservation easements, as well as the importance of the Boulder County Comprehensive Plan (BCCP) and its role in preventing urban sprawl. The big implications of the CEPS formation are: (1) Contributions to KARES are now tax exempt. (2) The group has retained an experienced environmental attorney who especially focuses on representing the interests of nonprofits. As mentioned in our previous update, the judge has ruled that the plaintiffs (residents/KARES members) have standing and the lawsuit can proceed. For more information, please see the KARES group website, stopkanemotosubdivision.com and especially the Updates tab of their website.
BACKGROUND: A developer has proposed a subdivision development of over 400 units on the 40-acre Kanemoto conservation easement. In summer 2023, the Boulder County Commissioners voted 2-1 to conditionally terminate the conservation easement, with termination conditioned upon the annexation of the property into the City of Longmont. An opposition group has filed a lawsuit against the County's 2023 decision for "conditional" termination of the Kanemoto conservation easement. In late February, the District Court Judge denied Boulder County's Motion to Dismiss the lawsuit, and ruled that the opposition group's lawsuit can proceed. Relevant links:
-
Longmont Times-Call article of 27 February 2024 (possible paywall for access)
-
Boulder County Website, Kanemoto Conservation Easement conditional termination; various documents including the 1982 Kanemoto Conservation Easement agreement and the plans for the proposed development are posted.
-
Opposition website with petition, updates, and information of the KARES (Keep Airport Road Environmental and Safe) citizen group. The community's help with petition signing, letter writing, and donations for the legal fund are actively being sought.



Proposed Subdivision in Historic Rural Area. (southwest corner of 63rd Street and Niwot Road)
-
The owners of a 40-acre property at the SW corner of 63rd Street and Niwot Road have proposed a subdivision, using Tranferable Development Rights to build 3 additional houses. This is County docket SD-23-0003.
-
The property is part of a historic rural/agricultural area, falls in the County’s category of Agricultural Lands of Statewide Significance, is recognized as a Protected View Corridor, and is adjacent to rural farms and ranches that define the character of the area.
-
The Boulder County Comprehensive Plan has protected this area from development for over 45 years.
-
Bicyclists, runners, nature enthusiasts, equestrians, and other recreationalists from throughout the County use this area extensively.
-
“Chipping away” at this 40-acre parcel for development is not in tune with the Boulder County Comprehensive Plan, and would set a new precedent that would threaten rural properties everywhere in Boulder County.
-
The Boulder County Planning staff have recommended denial of this application, based on its inconsistency with many principles, values, and rules of the Boulder County Comprehensive Plan and the Boulder County Land Use Code.
-
The Planning Commission recommended denial of the application at its 20 November 2024 hearing. 18 community members spoke against the proposal at this hearing.
-
The community has organized and a petition has gathered ~1100 signatures opposing this development.
-
See the opposition website, stop63rdstreetsubdivision.org, to find information, sign the petition, and submit comments to Boulder County.
-
The next step is a hearing on May 6 of the Board of County Commissioners. They will decide whether the application goes forward.


Boulder County maintains a website listing the development applications that are currently under review or recently reviewed (linked here). Their website gives an interactive map of these applications, and a searchable function for the type of application. See our webpage on Understanding Dockets and our how-to guide to navigating the county website for the dockets.
The Pro-RURAL Alliance is interested in applications that have broad implications for rural Boulder County. These include Subdivisions (SD), Special Use Reviews (SU), and Limited Impact Special Use Reviews (LU). These applications are designated as dockets, with names that give the type of application, year, and number. For example, SD-23-0003 is subdivision application #0003, proposed in 2023. (Note, many of the applications on the crowded County map are requests for improvements to individual properties, vacation rental status, etc. These are not the subject of the Pro-RURAL Alliance.)
As you’ll see on the County’s map, there are a LOT of dockets!! We have sifted through the County applications since ~2022 to find the larger projects affecting rural/unincorporated/recreational/agricultural lands. Please explore these on the map above and summary list below. We will update this information periodically. If you know of any additional County issues we should consider for inclusion on our list, please let us know.
Boulder County Development Applications (Dockets)
63 Baldwin Circle
Eldorado Springs 80025
BoCo Planner: Pete L’Orange
Status: Application received, 25 January 2024
FEBRUARY 2025 UPDATE: No change in status.
Griffith request for a Sketch Plan review for Planned Unit Development (PUD) consisting of a total of six (6) residential lots on approximately 1.5 acres at 63 Baldwin Circle, Eldorado Springs. Redirected from docket SE-23-0010.
6184 Niwot Road
Longmont 80503
BoCo Planner: Pete L’Orange
Status:
Applicants have revised and revived their original 2023 application in August 2024. The County planning staff recommended denial of the revised application, as did the Planning Commission at their November 2024 hearing. MARCH 2025 UPDATE: The application will go to a hearing of the Board of County Commissioners on May 6.
Rodriguez request for a Sketch Plan review for a Transferred Development Rights (TDR) / Planned Unit Development receiving site consisting of a revised total of four (4) residential lots on approximately 4 of the 39.5 acres.
9002 Valmont Rd.
Boulder 80301
BoCo Planner: Amber Knotts
Status:
Post-Approval. Boulder County Commissioners conditionally approved on 6/11/24. Letter linked here.
Limited Impact Special Use request to permit grading in excess of 500 cubic yards to construct a 1,469 cubic yard wood chip berm for management of the prairie dog population that would mitigate their expansion from unirrigated agricultural land to adjacent irrigated agricultural land on an approximately 174-acre parcel that is owned and leased by the City of Boulder
1600 County Rd. 126J and 735 County Rd. 128W
Nederland area 80466
Status:
Post-Approval. Approved conditionally by Board of County Commissioners, 18 April 2024. Letter with conditions sent to applicants on 5/16/24.
This application by Boulder County Parks and Open Space for Sherwood Creek Restoration requests Limited Impact Special Review for approximately 8,843 cubic yards of non-foundational earthwork to restore the Sherwood Creek stream channel and construct a section of hiking trail.
7850 Lookout Road
Longmont 80503
BoCo Planner: Jonathan Tardif
Status:
Post-Approval. Approved 1 August 2023.
The City of Boulder Open Space and Mountain Parks department (OSMP) plans to improve visitor experience, trail sustainability, and grassland habitat block size by creating a 2.6-mile loop trail on 244 acres of Gunbarrel Hill in Boulder County, CO. Construction of the loop will consist of repairing 9,062 feet of existing trail, building 9,823 feet of new trail, and closing and restoring 9,692 feet of existing rerouted trail and undesignated trail.
3651 N. 75th Street
Longmont 80503
BoCo Planner: Pete L’Orange
Status:
Post-Approval. Conditionally approved, 5 December 2023.
City of Boulder access and recreation improvements to the Sawhill Ponds open space
SU-24-0003 [New on our list, June 2024]
12350 Niwot Road
Longmont, 80504
BoCo Planner: Samuel Walker
Status:
FEBRUARY 2025 UPDATE: Application found to be complete on 2/5/2025. Under review.
Special-Use application for a dog kennel and dog boarding business on a 10-acre property zoned agricultural.
9215 Arapahoe Rd.
Lafayette 80026
BoCo Planner: Pete L’Orange
Status:
Approved by Board of County Commissioners on October 10. Submitted 2 April 2024. On July 17, the Planning Commission recommended conditional approval. Allowable panel height was reduced from 15 ft to 10 ft as one condition. The site is near a residential area and residents are concerned about impacts and precedent setting.
Pivot Solar Energy Facility Special Use Review request for an approximately 4-acre industrial-scale Solar Energy facility on a 13-acre parcel zoned Rural Residential and designated as Agricultural Land of National Significance.
9770 Isabelle Road
Lafayette 80026
BoCo Planner: Pete L’Orange
Status:
Post-Approval. Conditionally approved for ~7 acres, 5 Dec 2023.
Harvest Moon Solar Special Use Review request to construct an approximately 10.3-acre industrial-scale Solar Energy facility on an approximately 35.5-acre parcel zoned Agricultural
5701 N. 79th Street
Longmont 80503
BoCo Planner: Samuel Walker
Status:
Application officially withdrawn on 16 September 2024. Applicants tabled the request on 4 March 2024, before the Planning Commission hearing. Several department referrals did not find it consistent with BoCo planning and land use. Planning staff had concerns. Property was listed for sale in May 2024.
Tennis Center of the Rockies Special Use Review request to permit establishment of a Membership Club tennis facility, including a clubhouse, 26 courts, a swimming pool, and seasonal court coverings on a 19.73-acre parcel zoned Agricultural.
7754 Ute Highway
Longmont 80503
BoCo Planner: Samuel Walker
Status:
Placed on hold 16 August 2022 by BoCo Community Planning and Permitting/Access and Engineering Dept. No activity since August 2022.
Magpie Meadows Special Use Review request for the establishment of an Equestrian Center on the 4.6-acre property zoned Rural Residential, including the construction of a 8,712 sq. ft. indoor riding arena, 2,390 sq. ft. barn, 1,385 sq. ft. greenhouse, and a 200 sq. ft. residential addition as well as the approval of several unpermitted agricultural structures totaling 2,980 sq. ft.
Other Applications, Policies, or Projects
Proposed Changes to Boulder County Land Use Code (Expansion of residences in unincorporated Boulder County)
-
This issue has urgency and affects all homeowners in the unincorporated County who might want to add space to their residences in the future.
-
The County Commissioners asked staff to propose changes to the land use code to reduce the trend of increasing house sizes in unincorporated areas. The Commissioners' concerns are that this trend adversely impacts affordability, neighborhood character, and sustainability.
-
On January 17, 2025, the County Commissioners began a 6-month moratorium on accepting applications for houses above the median square footage for the defined neighborhood. Consideration of changes to the land use code is to occur in this moratorium period.
-
A draft of the proposed regulations and a summary of those regulations have been posted on the docket webpage (docket DC-24-0003).
-
If you have any thoughts or comments regarding the proposed regulations, send them via email to longrange@bouldercounty.gov.
-
At a March 19 hearing of the Planning Commission, about 15 members of the public spoke in opposition to the proposed new regulations. The Commission voted unanimously to recommend denial, and also voted to recommend that the moratorium be lifted.
-
The next step is a hearing and decision by the Boulder Board of County Commissioners. Date is TBD.
-
The changes proposed by staff are in Article 4 Section 800 of the County Land Use Code. The changes would:
-
Reduce the current compatible size from 125% of the median of a defined neighborhood [our emphasis added] to just the median of a defined neighborhood;
-
Change what is currently a size presumption (that allows more floor area in certain circumstances) to a size limitation based on the median of a defined neighborhood; and
-
Clarify the regulations to improve processes, increase the public’s ability to better navigate the regulations, and provide greater certainty of outcomes for applicants.
-
-
Our take on this: In these regulations, the use of the "defined neighborhood" concept to determine allowable residential square footage will have results that are very different for different homes in the County. According to the code, the defined neighborhood is "the area within 1,500 feet from the applicable parcel". The defined neighborhood area does not include any parcels that are within municipal boundaries, or any parcels in subdivisions of 7 or more houses [Article 18 Definitions, 18-179C]. We believe this concept of the defined neighborhood is too restrictive, too inflexible, and will inherently lead to inequities throughout the County. For example, a cluster of smaller, legacy farmhouses built in the 1950s in one area would be restricted from expanding to more realistic modern expectations simply because these houses are not within 1500 ft of any larger homes. Even if they are right next to a subdivision having 5000 sq ft homes, they'd be unable to expand because the subdivision houses "don't count" in the definition of the neighborhood. Yet just a half-mile down the road, there might be much larger homes, by virtue of their proximity to other larger homes. This does not make sense to us. Further compounding the problem, the homeowners of those legacy farmhouses might have a hard time selling their modest-sized homes in the future to families that want to consider continuing the farming traditions in Boulder County. This could lead to a loss of working farms and ranches in the County. A much more fair definition of "neighborhood," in our view, should take into account the median house size of a much larger area (perhaps even the entire County). This would even out the inequities of the 1500-foot definition of a neighborhood, which in rural areas is way too "microscopic."
-
This issue needs our response! Few County residents even know this is happening!
Action: Write to the County with your input on these proposed regulations. E-mail your comments to longrange@bouldercounty.gov and planner@bouldercounty.gov. Reference "docket DC-24-0003" in your comments, and state your name and address. Your comments will be considered at the next stage when the 3 County Commissioners will hold a hearing and make a decision.
Action: Attend and consider speaking at the County Commissioners' hearing (date TBD, watch this space!). The meeting will be at the Boulder County Courthouse (1325 Pearl Street, 3rd floor). Register in advance or in person at the Courthouse if you wish to speak at this hearing. There is a 3-minute time limit for speakers (others present at the hearing can sign up to donate time to a speaker). You can speak, or attend, either in person or virtually.
Information:
-
The County's webpage for the proposed changes (docket DC-24-0003) is linked here and further information is on the docket page linked here.
-
The Staff Recommendation packet for the March 19 Planning Commission hearing, including community comments, is out! A link is on the docket page.
-
Coverage in the Left Hand Valley Courier : March 5, 2025 December 25, 2024
-
Coverage in the Boulder Reporting Lab : February 27, 2025
-
Here is the link to the current Boulder County Land Use Code. (Caution: It's a lot. The site plan review section is in Article 4 Section 800.)
Major Update of the Boulder Valley Comprehensive Plan (BVCP). The BVCP will be updated in 2024-2026. The BVCP, and the broader Boulder County Comprehensive Plan (BCCP), are the "vision" documents that set the tone for how Boulder and the County will develop and preserve the land. This makes it an especially opportune time for us to stay informed and engaged with the process, because the decisions will affect rural Boulder County--and all of us--for years to come.
The BVCP guides long-range planning, development, and preservation in the City of Boulder and some Boulder County land. See a map of the "Boulder Valley" here. The City and County jointly developed the plan. The major update will go through approval processes with both the Boulder City Council and the County Commissioners, and there will be many opportunities for input from citizens.
We've attended some of the early events for the update of the BVCP. Our experience was that they've been largely focused on City of Boulder issues, and not so much on issues related to unincorporated County areas. And yet, the BVCP covers a great deal of the unincorporated County... There's actually more rural unincorporated land area than there is City land area within the boundaries of the BVCP (here's the map). We're most interested in what might happen pertaining to the unincorporated areas marked "Area III-Rural Preservation Area."
We believe that in the BVCP update, the Area III-Rural Preservation Areas should continue to be marked for preservation. We should advocate for the continued preservation of these areas during this update of the BVCP. This simple message is important to convey. Please consider entering your comments online and/or attending their public input events. They are not getting a lot of input from outside the City of Boulder, but they need to hear from all of us!
Here is the link to enter written comments: https://bouldercolorado.formstack.com/forms/bvcp_update_comments
In your comment, it is helpful if you indicate whether you live in the City or in an unincorporated area.
Here is the City's website for the plan update: https://a-boulder-future-boulder.hub.arcgis.com (contains upcoming events, and links for signing up for email updates)
County of Boulder Website for the BVCP Update (contains links for signing up for email updates)
Possible Annexation and Development of the Area III Planning Reserve. (north of City limits/northeast of Highway 36)
The Boulder City Council voted in November to direct staff to further study the potential for urbanization of the 500-acre "Area III Planning Reserve." It's a mix of city-owned and unincorporated County land that was designated in 1993 as an area for future consideration of development (as stated in the City/County's Boulder Valley Comprehensive Plan). If annexed, the City would have to provide roads, sewers, and other infrastructure services in the area, as well as capital improvements elsewhere in the City, likely costing $1 billion. A mix of retail, businesses, parkland, and residential is envisioned, with possibly over 6,000 homes and likely tens of thousands of residents and 3,000 jobs in the new development. The Area III discussion will occur within the larger context of the update of the Boulder Valley Comprehensive Plan, currently in progress. The project is the second major development project to come onto the Boulder city radar, the other being the potential decommissioning of the Boulder Municipal Airport for future housing. Links to more information about the Area III Planning Reserve: Daily Camera article (possible paywall) Boulder Reporting Lab article Biz West article City of Boulder website on Area III study
355 Apartments & Mixed-Use Development Near the Sugar Factory (11386 East Rogers Road): In January, the City of Longmont annexed ~9 acres of unincorporated land near the sugar plant, and it is slated for development into 355 apartments and mixed-use employment. Articles on this (possible paywall for access): Longmont Leader Longmont Times-Call
City/Tribal Concept Plan for Fort Chambers Open Space Property (63rd Street, south of Jay Road): A concept stewardship plan for open space land of historical and tribal significance has been developed. The City of Boulder worked closely with the Cheyenne and Arapaho tribes, the Arapaho Tribe, and the Cheyenne Tribe to develop the plan. Plan elements include ecological restoration, a healing trail, farmstead improvements, and visitor access. Public input on the plan was gathered in April 2024. Visit the city website for more information and to follow the concept plan as it evolves through the drafting stages.
Community Farmers Alliance (COFA): A new group formed in early 2024 focused on the issues most pressing to County farmers. Right now the issues are: the County's recent decision regarding minimum wage increases; and affordable housing for seasonal farm workers. Both issues have significant implications for the future of farming in Boulder County. The group represents about 90% of the farmers in the County. Give the group your feedback and sign up for their contact list at this link.
Boulder County Weed Management Plan: Boulder County Commissioners have postponed a decision on the Boulder County Integrated Weed Management Plan after copious public input at their April 16 meeting. Issues center around the aerial application of herbicides (via drones) versus alternative methods of weed management, and the concerning trend of weeds displacing native species. The plan covers a variety of private and public lands in the County, including Open Space lands. See the County website about the Plan, and the Daily Camera article of 16 April 2024.
Multiple Annexation and/or Development Proposals within Close Proximity, south Longmont near Airport/Nelson Roads:
-
310-Apartment Development Proposal Adjacent to Schlagel Neighborhood (8902 Quail Road, Clover Basin/Airport Road area, 18 acres). County land referred to annexation process for City of Longmont. February 2025 update: Application withdrawn by the developer at the February 4 hearing of the Longmont City Council. Citizen input and constructive dialogue with the City Council played a big role in the outcome.
-
100-Unit Development Proposal (9308 N. 87th Street, ~8 acres that are adjacent to the above 18 acres). County land referred to annexation process for City of Longmont.
-
172-Apartment Development Proposal Across from Schlagel Neighborhood (8809 Nelson Road, between Target and Airport Road).
-
255-Apartment Development Under Construction (9165 Nelson Road, just west of Target, 16 acres).
-
306-Apartment Development Proposal Across from Schlagel Neighborhood (3632 Nelson Road, Modern West F1 development, 20 acres).
-
Development Plan (8876 Rogers Road, Modern West F2 development, 27 acres) August update: Denied by Longmont City Council
-
426 Mixed-Unit Development Proposal (near Airport Road and Diagonal Hwy, Kanemoto Estates, 40 acres)
Longmont: Kanemoto Conservation Easement Conditional Termination/Possible 426-unit Subdivision Development (Airport Road/Diagonal Hwy): Discussed in our Top 3 Issues section (see above).
New Non-Profit, the Conservation Easement Preservation Society. This new 501(c)(3) non-profit just formed in late March, motivated by the Kanemoto issue and the more general issues raised by the County's actions regarding Conservation Easements. The expressed mission of CEPS is to preserve and protect conservation easements in Boulder County from residential and commercial development. The mission is to also educate the public regarding the environmental, ecological, and communal benefits of conservation easements, as well as the importance of the Boulder County Comprehensive Plan (BCCP) and its role in preventing urban sprawl. Contributions to the Kanemoto opposition group are now via CEPS and are tax exempt.
Issues at the Nexus of Aviation and Development: Longmont is trying to balance development plans with aviation/FAA rules in area near Vance Brand airport: Longmont Times-Call
August Update: The Longmont City Council denied this development on 28 August. Longmont Times-Call Story
Solar Facilities Popping Up in Rural Areas: A relatively new category of issue seems to be arising in rural areas-- applications for the installation of solar energy facilities on agricultural or rural residential lands. See SU-24-0002 and the County's referral document (Pivot Solar Energy/Xcel Energy proposal for 4 acres, 9215 Arapahoe Rd.) and SU-23-0005 (Harvest Moon proposal for 10 acres, 9770 Isabelle Rd.) See our Top 3 Issues item about Pivot Solar.
Erie Town Council Votes to Deny High-Density Residential Zoning at 111th and Arapahoe: Upon seeing the signs posted about the zoning proposal, the community organized very quickly and effectively to research the many issues raised by rezoning to high density for the proposed 336 units on this parcel. The Erie Town Council heard some 3 hours of testimony by over 80 residents on June 11, and continued the issue until a June 18 meeting. At that meeting, after 3-1/2 hours of questions and discussion by the council members, staff, and the developer, the final vote was taken at about 11:15 pm: 5-1 AGAINST the rezoning. The two main issues identified by council members as they cast their vote were: inadequacy of infrastructure for the development (especially related to traffic and drainage), and overwhelming community opposition and concern. Articles about this issue: June 18 meeting recap by Colorado Hometown Weekly June 11 meeting recap by Daily Camera (paywall) Erie Community's Victory Message
July Update: The Erie community that organized against this rezoning has remained active and will provide input in the town's "Elevate Erie" initiative to update its Comprehensive Plan & Transportation Mobility Plan. The impact that various proposals for high-density developments would have on open spaces, single-family residential areas, and Erie's "small-town" feel are issues of concern to residents. October/September/August Update: Individuals who led the opposition are engaging in Erie politics, and are running for Town Council.
Fracking Proposal Would Reach Across County Lines & Underneath Erie Homes:
The application by Civitas/Extraction proposes extreme-length 5-mile wellbores to be drilled horizontally from the Draco Well Pad in Weld County westward into Boulder County and underneath highly populated residential developments. Vigorous community opposition mobilized and spoke/wrote against this proposal last year and at the November hearing.
In the November hearing, the ECMC directed Civitas/Extraction to consider alternative sites for their operations.
In March 2025, Civitas/Extraction requested to resume the hearing. They reevaluated the proposed Alternative Location #4 (AL4), located north of the Vista Ridge neighborhood, west of Weld County Road 5. The reevaluation (available in Civitas/Extraction’s Prehearing Statement) concluded that Civitas/Extraction believes AL4 is an infeasible alternative to the Draco Pad location. Presuming the Commission concurs with this conclusion, the Town of Erie will be requesting that the Draco OGDP be denied unless specific Conditions of Approval are ordered by the Commission.
Hearing Date and possible ECMC decision: March 26.
Information:
-
All the docket information is at:
https://oitco.hylandcloud.com/DNRCOGPublicAccess/
Select: DNRCOG Search for Docket Related Documents
The in the field for DNRCOG Docket Number enter 240100004
-
Also see the citizen "Erie Protectors" website, which posts the Civitas/Extraction prehearing statement and some analysis.
Longmont City Planning/Development Dept: Link to map and log of active projects. Note:you have to contact the assigned planner to get specific information about a project!
Longmont Development Link: Here’s another useful link for tracking developments in Longmont
8130 N. 73rd Street
Longmont 80503
BoCo Planner: Pete L'Orange
Status: Hearing by the Board of County Commissioners will be on March 11 at 1 pm.
Limited Impact Special Review for an Equestrian Center with more than 25,000 square feet of floor area, an Agricultural Worker Accessory Dwelling Unit, and non-foundational earthwork exceeding 500 cubic yards, and Site Plan Review for a new 5,352-square-foot residence where the presumed compatible size is 5,934 square feet at 8130 N 73rd Street.